1 Chen,L.,Huang,Y.L.,"Integrated product and process control for sustainable semiconductor manufacturing",Chin.J.Chem.Eng.,19 (2),192-198 (2011). 2 Chen,J.H.,Fu,L.C.,Lin,M.H.,Huang,A.C.,"Petri-net and GA-based approach to modeling,scheduling,and performance evaluation for wafer fabrication",IEEE Transactions on Robotics and Automation,17 (5),619-636 (2001). 3 Cao,Z.C.,Peng,Y.Z.,Wang,Y.J.,"A drum-buffer-rope based scheduling method for semiconductor manufacturing system",In: 2011 IEEE Conference on Automation Science and Engineering,Wang,M.Y.,ed.,IEEE Publications,Italy,120-125 (2011). 4 Meidan,Y.,Lerner,B.,Rabinowitz,G.,Hassoun,M.,"Cycle-time key factor identification and prediction in semiconductor manufacturing using machine learning and data mining",IEEE Transactions on Semiconductor Manufacturing,24 (2),237-248 (2011). 5 Topaloglu,S.,Kilincli,G.,"A modified shifting bottleneck heuristic for the reentrant job shop scheduling problem with makespan mini-mization," The International Journal of Advanced Manufacturing Technology,44 (7-8),781-794 (2009). 6 Lin,L.,Qing,C.,Jun,N.,"Data driven bottleneck detection of manufacturing systems," International Journal of Production Research,47 (18),5019-5036 (2009). 7 Ye,T.F.,Han,W.M.,"Method of simulation on determining bottleneck resource",Journal of East China Shipbuilding Institute (Natural Science Edition),17 (4),80-84 (2005).(in Chinese) 8 Moss,H.K.,Yu,W.B.,"Toward the estimation of bottleneck shiftiness in a manufacturing operation",Production and Inventory Management Journal,40 (2),53-58 (1999). 9 Liu,M.Z.,Tang,J.,Ge,M.,Jiang,Z.Q.,Hu,J.,Ling,L.,"Dynamic prediction method of production logistics bottleneck based on bottleneck index",Chinese Journal of Mechanical Engineering,22 (5),710-716 (2009). 10 Jang,J.S.R.,"ANFIS: Adaptive-network-based fuzzy inference system",IEEE Transactions on Systems,Man,and Cybernetics,23 (3),665-685 (1993). 11 Liu,M.,Dong,M.Y.,Wu,C.,"A new ANFIS for parameter prediction with numeric and categorical inputs",IEEE Transactions on Automation Science and Engineering,7 (3),645-653 (2010). 12 Khazraee,S.M.,Jahanmiri,A.H.,"Composition estimation of reactive batch distillation by using adaptive neuro-fuzzy inference system",Chin.J.Chem.Eng.,18 (4),703-710 (2010). 13 Huang,H.P.,Chen,T.Y.,"A new approach to on-line rescheduling for a semiconductor foundry fab",In: Proceedings of International Conference on System,Man and Cybernetics,Wu,B.F.,ed.,IEEE Publications,Taiwan,4727-4732 (2006). 14 Wang,W.P.,Chen,Z.,"A neuro-fuzzy based forecasting approach for rush order control applications",Expert System with Applications,35 (1),223-234 (2008) 15 Zhang,M.,Yu,J.,"Fuzzy partitional clustering algorithms",Journal of Software,15 (6),858-868 (2004).(in Chinese) 16 Yue,Y.F.,Mao,J.Q.,"Fast adaptive modeling based on T-S model",Control and Decision,17(2),155-158 (2002).(in Chinese) 17 Wang,Z.T.,Wu,Q.D.,Qiao,F.,"A lot dispatching strategy integrating WIP management and wafer start control",IEEE Transactions on Automation Science and Engineering,4 (4),579-583 (2007). |