[1] C.A. Floudas, X. Lin, Continuous-time versus discrete-time approaches for scheduling of chemical processes:A review, Comput. Chem. Eng. 28(11) (2004) 2109-2129. [2] A. Carlos, C.A. Mendez, J. Cerda, I.E. Grossmann, et al., State-of-the-art review of optimization methods for short-term scheduling of batch processes, Comput. Chem. Eng. 30(2006) 913-946. [3] Y. Liu, I.A. Karimi, Novel continuous-time formulations for scheduling multi-stage batch plants with identical parallel units, Comput. Chem. Eng. 31(2007) 1671-1693. [4] M.E. Dogan, I.E. Grossmann, Slot-based formulation for the short-term scheduling of multistage multiproduct batch plants with sequence-dependent changeovers, Ind. Eng. Chem. Res. 47(4) (2008) 1159-1183. [5] L.J. Zeballos, J.M. Novas, G.P. Henning, A CP formulation for scheduling multiproduct multistage batch plants, Comput. Chem. Eng. 35(2011) 2973-2989. [6] S. Velez, C.T. Maravelias, Multiple and nonuniform time grids in discrete-time MIP models for chemical production scheduling, Comput. Chem. Eng. 53(2013) 70-85. [7] I. Harjunkoski, C. Maravelias, P. Bongers, et al., Scope for industrial applications of production scheduling models and solution methods, Comput. Chem. Eng. 62(2014) 161-193. [8] J.M. Pinto, I.E. Grossmann, A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants, Ind. Eng. Chem. Res. 34(9) (1995) 3037-3051. [9] J.M. Pinto, I.E. Grossmann, An alternate MILP model for short-term scheduling of batch plants with preordering constraints, Ind. Eng. Chem. Res. 35(1) (1996) 338-342. [10] C.W. Hui, A. Gupta, Harke A.J. van der Meulen, A novel MILP formulation for shortterm scheduling of multi-stage multi-product batch plants with sequencedependent constraints, Comput. Chem. Eng. 24(12) (2000) 2705-2717. [11] C.W. Hui, A. Gupta, A novel MILP formulation for short-term scheduling of multistage multi-product batch plants, Comput. Chem. Eng. 24(2-7) (2000) 1611-1617. [12] S. Gupta, I.A. Karimi, An improved MILP formulation for scheduling multiproduct multistage batch plants, Ind. Eng. Chem. Res. 42(2003) 2365-2380. [13] P.M. Castro, I.E. Grossmann, New continuous-time MILP model for the short-term scheduling of multistage batch plants, Ind. Eng. Chem. Res. 44(2005) 9175-9190. [14] P.M. Castro, I.E. Grossmann, A.Q. Novais, Two new continuous-time models for the scheduling of multistage batch plants with sequence dependent changeovers, Ind. Eng. Chem. Res. 45(2006) 6210-6226. [15] Y.F. Xue, J.Q. Yuan, Scheduling model for a multi-product batch plant using a preordering approach, Chem. Eng. Technol. 31(3) (2008) 433-439. [16] Y. He, C.W. Hui, Genetic algorithm for large-size multi-stage batch plant scheduling, Chem. Eng. Sci. 62(5) (2007) 1504-1523. [17] B. Shi, L.X. Yan, W. Wu, Rule-based scheduling of single-stage multiproduct batch plants with parallel units, Ind. Eng. Chem. Res. 51(2012) 8535-8549. [18] L.X. Yan, Solving combinatorial optimization problems with line-up competition algorithm, Comput. Chem. Eng. 27(2) (2003) 251-258. [19] L.X. Yan, K. Shen, S.H. Hu, Solving mixed integer nonlinear programming problems with line-up competition algorithm, Comput. Chem. Eng. 28(12) (2004) 2647-2657. |