1 Kondili, E., Pantelides, C.C., Sargent, R.W.H., "A general algorithm for short-term scheduling of batch operations—I. MILP formulation", Comput. Chem. Eng., 17, 211-227 (1993). 2 Pantelides, C.C., "Unified frameworks for optimal process planning and scheduling", In: Proc. Second Conf. on Foundations of Computer Aided Operations, Rippin, D.W.T., Hale, J., eds., CACHE Publications, 253-274 (1994).3 Floudas, C.A., Lin, X., "Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review", Comput. Chem. Eng., 28, 2109-2129 (2004).4 Pinto, J.M., Grossmann, I.E., "Optimal cyclic scheduling of multistage continuous multiproduct plants", Comput. Chem. Eng., 18, 797-816 (1994).5 Pinto, J.M., Grossmann, I.E., "A continuous time mixed integer linear programming for short term scheduling of multistage batch", Ind. Eng. Chem. Res., 34, 3037-3051 (1995).6 Karimi, I.A., McDonald, C.M., "Planning and scheduling of parallel semi-continuous processes. 2. short-term scheduling", Ind. Eng. Chem. Res., 36, 2701-2714 (1997).7 Lamba, N., Karimi, I.A., "Scheduling parallel production lines with resource constraints. 1. Model formulation", Ind. Eng. Chem. Res., 41, 779-789 (2002).8 Lamba, N., Karimi, I.A., "Scheduling parallel production lines with resource constraints. 2. Decomposition algorithm", Ind. Eng. Chem. Res., 41, 790-800 (2002).9 Zhang, X., Sargent, R.W.H., "The optimal operation of mixed production facilities—A general formulation and some approaches for the solution", Comput. Chem. Eng., 20, 897-904 (1996).10 Zhang, X., Sargent, R.W.H., "The optimal operation of mixed production facilities—Extensions and improvements", Comput. Chem. Eng., 22, 1287-1295 (1998).11 Wang, S., Guignard, M., "Redefining event variable for efficient modeling of continuous-time batch processing", Ann. Oper. Res., 116, 113-126 (2002).12 Castro, P.M., Barbosa-Povoa, A.P., Matos, H.A., Novais, A.Q., "Simple continuous-time formulation for the short time scheduling of multipurpose batch plants", Ind. Eng. Chem. Res., 43, 105-118 (2004).13 Ierapetritou, M.G., Floudas, C.A., "Effective continuous-time formulation for short-term scheduling: 1. Multipurpose batch processes", Ind. Eng. Chem. Res., 37, 4341-4359 (1998).14 Lin, X., Floudas, C.A., "Design, synthesis and scheduling of multipurpose batch plants via an effective continuous-time formulation", Comput. Chem. Eng., 25, 665-674 (2001).15 Lin, X., Chajakis, E.D., Floudas, C.A., "Scheduling of tanker lightering via a novel continuous-time optimization framework", Ind. Eng. Chem. Res., 42, 4441-4451 (2003).16 Shaik, M.A., Janak, S.L., Floudas, C.A., "Continuous-time models for short-term scheduling of multipurpose batch plants: A comparative study", Ind. Eng. Chem. Res., 45, 6190-6209 (2006).17 Shaik, M.A., Floudas, C.A., "An improved unit-specific event-based continuous-time model for short-term scheduling of continuous processes: Rigorous treatment of storage requirements", Ind. Eng. Chem. Res., 46, 1764-1779 (2007).18 Shaik, M.A., Floudas, C.A., "Unit-specific event-based continuous-time approach for short-term scheduling of batch plants using RTN framework", Comput. Chem. Eng., 32, 260-274 (2008).19 Li, J., Susarla, N., Karimi, I.A., Shaik, M.A., Floudas, C.A., "An analysis of some unit-specific event-based models for the short-term scheduling of noncontinuous processes", Ind. Eng. Chem. Res., 49, 633-647 (2010).20 Vooradi, R., Shaik, M.A., "Improved three-index unit-specific event-based model for short-term scheduling of batch plants", Comput. Chem. Eng., 34, 148-172 (2012).21 Yan, L., "A new global optimization search algorithm for process system", Ph. D. Thesis, Beijing Univ. Chem. Tech., Beijing (1998). (in Chinese)22 Yan, L., Ma, D., "Global optimization of nonconvex nonlinear programs using line-up competition algorithm", Comput. Chem. Eng., 25, 1601-1610 (2001).23 Yan, L., Shen K., Hu, S., "Solving mixed integer nonlinear programming problems with line-up competition algorithm", Comput. Chem. Eng., 28, 2647-2657 (2004).24 Yan, L., "Solving combinatorial optimization problems with line-up competition algorithm", Comput. Chem. Eng., 27, 251-258 (2003). 25 Chen, G., Shi, B., Yan, L., "Multi-period optimal operational planning of boiler steam system based on line-up competition algorithm", Energy Procedia, 14, 613-619 (2012).26 Shi, B., Yan, L., "Scheduling of multi-purpose batch process with parallel units", CIESC Journal, 61, 2875-2880 (2010). (in Chinese)27 Shi, B., Yan, L., Wu, W., "Rule-based scheduling of single-stage multiproduct batch plants with parallel units", Ind. Eng. Chem. Res., 51, 8535-8549 (2012). |