1 Wang,Y.P.,Smith,R.,"Wastewater minimization",Chem.Eng.Sci.,49 (7),981-1006 (1994). 2 Kim,J.K.,Smith,R.,"Automated design of discontinuous water system",Trans.IChemE B,82 (B3),238-248 (2004). 3 Liu,YJ.,Yuan,X.G,l.,uo,Y.Q.,"Synthesis of water utilization system using concentration interval analysis method (Ⅰ) Non-mass-transfer-based operation",Chin.J.Chem.Eng.,15 (3),361-368 (2007). 4 Liu,YJ.,Yuan,X.G.,Luo,Y.Q.,"Synthesis of water utilization system using concentration interval analysis method (Ⅱ) Discontinuous process",Chin.J.Chem.Eng.,15 (3),369-375 (2007). 5 El-Halwagi,M.M.,Gabriel,E,Harell,D.,"Rigorous graphical targeting for resource conservation rio material recycle/reuse networks",Ind.Eng.Chem.Res.,42 (19),4319-4328 (2003). 6 Savelskil,M.J.,Bagajewicz,i.J.,"On the optimality conditions of water utilization systems in process plants with single contami-nants ",Chem.Eng.Sci.,55,5035-5048 (2000). 7 Feng,X.,Seider,W.D.,"New structure and design methodology for water networks",Ind.Eng.Chem.Res.,40,6140-6146 (2001). 8 Wang,B.,Feng,X.,Zhang,Z.X.,"A design methodology for multi-pie-contaminant water networks with single internal water main",Comput.Chem.Eng.,27 (7),903-911 (2003). 9 Alva-Argaez,A.A.,Kokossis,C.,Smith,R.,"Wastewater minimization of industrial system using an integrated approach",Comput.Chem.Eng.,22 (Suppl.),S741-S744 (1998). 10 Alva-Argaez,A.,Kokossis,C.,Smith,R.,"A multi-contaminant transhipment model for mass exchanger networks and wastewater minimization",Comput.Chem.Eng.,23,1439-1453 (1999). 11 Bagajewicz,M.,Rivas,M.,Savelski,M.,"A new approach to the design of utilization systems with multiple contaminants in process plants meeting",In:Fall 1999 Annual Meeting,AIChE,Dallas,TX (1999). 12 Lee,S.,Grossmann,I.E.,"Global optimization of nonlinear general-ized disjunctive programming with bilinear equality constraints:Ap-plications to process networks",Comput.Chem.Eng.,27,1557-1575 (2003). 13 Karuppiah.R.,Grossmann,I.E.,"Global optimization for the synthesis of integrated water systems in chemical processes",Comput.Chem.Eng.,30,650-673 (2006). 14 Castro,P.M.,Matos,H.A.,Nova.is,A.Q.,"An efficient heuristic procedure for the optimal design of wastewater treatment systems",Resour.,Conserv.Recycl.,50,158-185 (2007). 15 Statyukha,G.,Kvitka,O.,Dzhygyrey,L,Jezowski,J.,"A simple sequential approach for designing industrial wastewater treatment networks",Journal of Cleaner Production,16 (2),215-224 (2008). 16 Takama,N.,Kuriyama,Y.,Shiroko,K.,Umeda,T.,"Optimal water allocation in a petrochemical refinery",Comput.Chem.Eng.,4,251-258 (1980). 17 Huang,C.H.,Chang,C.T.,Ling,H.C.,Chang,C.C.,"A mathematical programming model for water usage and treatment network de-sign",Ind.Eng.Chem.Res.,38,2666-2679 (1999). 18 Karuppiah,R.,Grossmann,I.E.,"Global optimization for the synthesis of integrated water systems in chemical processes",Comput.Chem.Eng.,30,650-673 (2006). 19 Luo,Y.Q.,Yuan.X.G,Liu,Y.J.,"An improved PSO algorithm for solving non-convex NLP/MINLP problems with equality constraints",Comput.Chem.Eng.,31,153-162 (2007). 20 Kennedy,J.,Eberhart,R.C.,"Particle swarm optimization",In:Proceedings of the IEEE International Conference on Neural Networks,IEEE Service Center,Piscataway,NJ,volume Ⅳ,1942-1948 (1995). |