1 Floudas, C.A., Lin, X., “Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review”, Comput. Chem. Eng., 28, 2109-2129 (2004). 2 Shaik, M.A., Janak, S.L., Floudas, C.A., “Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study”, Ind. Eng. Chem. Res, 45, 6190-6209 (2006). 3 Mendez, C.A., Cerda, J., Grossmann, I.E., Harjunkoski, I., Fahl, M.,“State-of-the-art review of optimization methods for short-term scheduling of batch processes”, Comput. Chem. Eng., 30, 913-946 (2006). 4 Maravelias, C.T., Grossmann, I.E., “New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants”, Ind. Eng. Chem. Res., 42, 3056-3074 (2003). 5 Castro, P., Barbosa-Povoa, A.P.F.D., Matos, H., “An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants”, Ind. Eng. Chem. Res., 40, 2059-2068 (2001). 6 Ierapetritou, M.G., Floudas, C.A., “Effective continuous-time formulation for short-term scheduling ·1· multipurpose batch process”, Ind. Eng. Chem. Res., 37 (11), 4341-4359 (1998). 7 Giannelos, N.F., Georgiadis, M.C., “A simple new continuous-time formulation for short-term scheduling of multipurpose batch processes”, Ind. Eng. Chem. Res., 41, 2178-2184 (2002). 8 Sundaramoorthy, A., Karimi, I.A., “A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants”, Chem. Eng. Sci., 60, 2679-2702 (2005). 9 Pan, M., Qian, Y., Li, X., “A novel precedence-based and heuristic approach for short-term scheduling of multipurpose batch plants”, Chem. Eng. Sci., 63, 4313-4332 (2008). 10 Pan, M., Qian, Y., Li, X., “Modified MILP model for scheduling of sequential multipurpose batch plants”, J. Chem. Ind. Eng. (China),57 (4), 861-866 (2006). (in Chinese) 11 Wu, J., He, X., Chen, B., Qiu, T., “A new continuous-time MILP model for scheduling of multi-product batch plants”, J. Chem. Ind. Eng. (China), 54 (9), 1251-1256 (2003). (in Chinese) 12 Kondili, E., Pantelides, C.C., Sargent, R.W.H., “A general algorithm for short-term scheduling of batch operations. Part 1. MILP formulation”, Comput. Chem. Eng., 17, 211-227 (1993). 13 Pantelides, C.C., “Unified frameworks for optimal process planning and scheduling”, Foundations of Computer-aided Process Operations, Cache Publications, New York, 253-274 (1994). 14 Shah, N., Pantelides, C.C., Sargent, W.H., “A general algorithm for short-term scheduling of batch operations (II) Computational issues”, Comput. Chem. Eng., 2, 229-244 (1993). 15 Cerda, J., Henning, G.P., Grossmann, I.E., “A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines”, Ind. Eng. Chem. Res., 36,1695-1707 (1997). 16 Mendez, C.A., Cerda, J., “An MILP continuous-time framework for short-term scheduling of multipurpose batch processes under different operation strategies”, Optimization and Engineering, 4, 7-22 (2003). 17 Pinto, J.M., Grossmann, I.E., “Continuous time mixed integer linear programming model for short term scheduling of multistage batch plants”, Ind. Eng. Chem. Res., 34 (9), 3037-3051 (1995). 18 Lamba, N., Karimi, L.A., “Scheduling parallel production lines with resource constraints (1) Model formulation”, Ind. Eng. Chem. Res.,41, 779-789 (2002). 19 Mockus, L., Reklaitis, G.V., “Mathematical programming formulation for scheduling of batch operations based on nonuniform time discretization”, Comput. Chem. Eng., 21, 1147-1156 (1997). |