1 Pinto, J.M., Joly, M., “Planning and scheduling models for refinery operations”, Comput. Chem. Eng., 24, 2259-2276 (2000). 2 Jia, Z., Ierapetritou, M., “Efficient short-term scheduling of refinery operations based on a continuous time formulation”, Comput. Chem. Eng., 28, 1001-1019 (2004). 3 Reddy, P.C.P., Karimi, I.A., “A new continuous-time formulation for scheduling crude oil operations”, Chem. Eng. Sci., 59, 1325-1341 (2004). 4 G the-Lundgren, M., Lundgren, J.T., “An optimization model for refinery production scheduling”, Int. J. Prod. Econ., 78,255-270 (2002). 5 Glismann, K., Gruhn, G., “Short-term scheduling and recipe optimization of blending processes”, Comput. Chem. Eng., 25, 627-634 (2001). 6 Jia, Z., Ierapetritou, M., Kelly, J.D., “Refinery short-term scheduling using continuous time formulation: Crude-oil operations”, Ind. Eng. Chem. Res., 42, 3085-3097 (2003). 7 Moro, L.F.L., Pinto, J.M., “Mixed-integer programming approach for short-term crude oil scheduling”, Ind. Eng. Chem. Res., 43,85-94 (2004). 8 Bhattacharya, S., Bose, S.K., “Mathematical model for scheduling operationsin cascaded continuous processing units”, Eur. J. Oper. Res., 182, 1-14 (2007). 9 Pinto, J.M., Joly, M., “Planning and scheduling models for refinery operations”, Comput. Chem. Eng., 24, 2259 (2000). 10 Floudas, C.A., Lin, X., “Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review”, Comput. Chem. Eng., 28, 2109-2129 (2004). 11 Paolucci, M., Sacile, R., “Allocating crude oil supply to port and refinery tanks: A simulation-based decision support system”, Decision Support Syst., 33, 39-54 (2002). 12 Chryssolouris, G., Papakostas, N., “Refinery short-term scheduling with tank farm, inventory and distillation management: An integrated simulation-based approach”, Eur. J. Oper. Res., 166, 812-827 (2005). 13 Zhao, X.Q., RONG, G., “Blending scheduling under uncertainty based on particle swarm optimization algorithm”, Chin. J. Chem. Eng., 13, 535-541 (2005). 14 Van den Heever, S.A., Grossmann, I.E., “A strategy for the integration of production planning and reactive scheduling in the optimization of a hydrogen supply network”, Comput. Chem. Eng., 27,1813-1839 (2003). 15 Bassett, M.H., Dave, P., Doyle, F.J., Kudva, G.K., Pekny, J.F., Reklaitis, G.V., Subramanyam, S., Miller, D.L., Zentner, M.G., “Perspectives on model based integration of process operations”, Comput. Chem. Eng., 20, 821-844 (1996). 16 Birewar, D.B., Grossmann, I.E., “Simultaneous production planning and scheduling of multiproduct batch plants”, Ind. Eng. Chem. Res.,29, 570 (1990). 17 Guillén, G., Badell, M., Espuna, A., Puigjaner, L., “Simultaneous optimization of process operations and financial decisions to enhance the integrated planning/scheduling of chemical supply chains”, Comput. Chem. Eng., 30, 421-436 (2006). 18 Cheng, L.F., Subrahmanian, E., Westerberg, A.W., “A comparison of optimal control and stochastic programming from a formulation and computation perspective”, Comput. Chem. Eng., 29, 149-164 (2004). 19 Sahinidis, N.V., “Optimization under uncertainty: State-of-the-art and opportunities”, Comput. Chem. Eng., 28, 971-983 (2004). 20 Janak, S.L., Lin, X., Floudas, C.A., “A new robust optimization approach for scheduling under uncertainty II. Uncertainty with known probability distribution”, Comput. Chem. Eng., 31, 171-195 (2007). 21 Leung, S.C.H., Tsang, S.O.S., Ng, W.L., Wu, Y., “A robust optimization model for multi-site production planning problem in an uncertain environment”, Eur. J. Oper. Res., 181, 224-238 (2007). 22 Luo, C.P., Rong, G., “Hierarchical approach for short-term scheduling in refineries”, Ind. Eng. Chem. Res., 46, 3656-3668 (2007). 23 Kelly, J.D., “Production modeling for multimodal operations”, Chemical Engineering Progress, 100, 44-47 (2004). 24 Kelly, J.D., “Logistics: The missing link in blend scheduling optimization”, Hydrocarbon Processing, 45-55 (2006). 25 Shah, N., “Mathematical programming techniques for crude oil scheduling”, Comput. Chem. Eng., 20, 1227-1232 (1996). 26 Adhitya, A., Srinivasan, R., Karimi, I.A., “A model-based rescheduling framework for managing abnormal supply chain events”, Comput. Chem. Eng., 31, 496-518 (2005). 27 Adhitya, A., Srinivasan, R., Karimi, I.A., “Heuristic rescheduling of crude oil operations to manage abnormal supply chain events”, AIChE J., 53, 397-422 (2007). |