[1] R. Shafaei, P. Brunn,Workshop scheduling using practical (inaccurate) data. Part 3: a framework to integrate job releasing, routing and scheduling functions to create a robust predictive schedule, Int. J. Prod. Res. 38 (1) (2000) 85-99. [2] G. Chryssolouris, S. Chan, W. Cobb, Decision making on the factory floor: an integrated approach to process planning and scheduling, Robot. Comput. Integr. Manuf. 1 (3-4) (1984) 315-319. [3] G. Chryssolouris, S. Chan, An integrated approach to process planning and scheduling, CIRP Ann. Manuf. Technol. 34 (1) (1985) 413-417. [4] N. Nasr, A. Elsayed, Job shop scheduling with alternative machines, Int. J. Prod. Res. 28 (9) (1990) 1595-1609. [5] P. Bandeimarte, M. Calderini, A heuristic bicriterion approach to integrated process plan selection and job shop scheduling, Int. J. Prod. Res. 33 (1) (1995) 161-181. [6] K.H. Kim, J.Y. Song, K.H. Wang, A negotiation based scheduling for items with flexible process plan, Comput. Ind. Eng. 33 (3-4) (1997) 785-788. [7] K.H. Kim, P.J. Egbelu, A mathematical model for job shop scheduling with multiple process plan consideration per job, Prod. Plan. Control 9 (3) (1998) 250-259. [8] C. Saygin, S.E. Kilic, Integrating flexible process plans with scheduling in flexible manufacturing systems, Int. J. Adv. Manuf. Technol. 15 (4) (1999) 265-280. [9] W. Tan, Integration of process planning and scheduling — a review, J. Intell. Manuf. 11 (1) (2000) 51-63. [10] H. Lee, S.S. Kim, Integration of process planning and scheduling using simulation based genetic algorithms, Int. J. Adv. Manuf. Technol. 18 (8) (2001) 586-590. [11] Y.K. Kim, K. Park, J. Ko, A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling, Comput. Oper. Res. 30 (8) (2003) 1151-1171. [12] R. Kumar, M.K. Tiwari, R. Shankar, Scheduling of flexible manufacturing systems: an ant colony optimization approach, P. I. MECH. ENG. B-J. ENG. 217 (11) (2003) 1443-1453. [13] W. Tan, B. Khoshnevis, A linearized polynomial mixed integer programming model for the integration of process planning and scheduling, J. Intell. Manuf. 15 (5) (2004) 593-605. [14] T.N. Wong, C.W. Leung, K.L. Mak, R.Y.K. Fung, An agent-based negotiation approach to integrate process planning and scheduling, Int. J. Prod. Res. 44 (7) (2006) 1331-1351. [15] L.H. Wang, W.M. Shen, Q. Hao, An overview of distributed process planning and its integration with scheduling, Int. J. Comput. Appl. Technol. 26 (1-2) (2006) 3-14. [16] W.D. Li, C.A. McMahon, A simulated annealing-based optimization approach for integrated process planning and scheduling, Int. J. Comput. Integr. Manuf. 20 (1) (2007) 80-95. [17] C. Moon, Y.H. Lee, C.S. Jeong, Y.S. Yun, Integrated process planning and scheduling in a supply chain, Comput. Ind. Eng. 54 (4) (2008) 1048-1061. [18] X.Y. Shao, X.Y. Li, L. Gao, Ch.Y. Zhang, Integration of process planning and scheduling — a modified genetic algorithm-based approach, Comput. Oper. Res. 36 (6) (2009) 2082-2096. [19] X.Y. Li, X.Y. Shao, L. Gao, W.R. Qian, An effective hybrid algorithm for integrated process planning and scheduling, Int. J. Prod. Econ. 126 (2) (2010) 289-298. [20] C.W. Leung, T.N. Wong, K.L. Mak, R.Y.K. Fung, Integrated process planning and scheduling by an agent-based ant colony optimization, Comput. Ind. Eng. 59 (1) (2010) 166-180. [21] T.N. Wong, S.C.H. Zhang, G. Wang, L.P. Zhang, Integrated process planning and scheduling — multi-agent system with two-stage ant colony optimization algorithm, Int. J. Prod. Res. 50 (21) (2012) 6188-6201. [22] Y.W. Guo, W.D. Li, A.R. Mileham, G.W. Owen, Applications of particle swarm and optimization in integrated process planning and scheduling, Robot. Comput. Integr. Manuf. 25 (2) (2009) 280-288. [23] Y.C. Ho, C.L. Moodie, Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities, Int. J. Prod. Res. 34 (10) (1996) 2901-2923. [24] M. Dorigo, V. Maniezzo, A. Colorni, The ant system: optimization by a colony of cooperating agents, IEEE Trans. Syst. Man Cybern. Syst. 26 (2) (1996) 29-41. [25] Y.K. Kim, A set of data for the integration of process planning and job shop scheduling, Available at/ http://syslab.chonnam.ac.kr/links/data-pp&s.doc 2003. |