[1] I. Harjunkoski, I.E. Grossmann, A decomposition approach for the scheduling of a steel plant production, Comput. Chem. Eng. 25 (2) (2001) 1647-1652. [2] K. Lee, S.Y. Chang, Y. Hong, Continuous slab caster scheduling and interval graphs, Prod. Plan. Control 15 (5) (2004) 495-501. [3] D. Ouelhadj, P.I. Cowling, S. Petrovic, Utility and stability measures for agent-based dynamic scheduling of steel continuous casting, IEEE International Conference on Robotics and Automation, University of Nottingham, UK, 131-138 (Nakaoka, S.). [4] J. Neuwirth, A production scheduling system at the Stahl Linz Gmbh, in: D.K. Baik (Ed.), International Conference on Computerized Production Control in Steel Plant, Korean Institute of Metals and Materials, Korea, 1993, pp. 142-347. [5] Y. Jimichi, A. Hori, H. Ishihara, T. Odira, An expert system of automatic slab assignment for hot strip mill, ISIJ Int. 30 (1990) 155-159. [6] K. Stohl, W. Spopek, VAI-Schedex: a hybrid expert system for co-operative production scheduling in steel plant, in: D.K. Baik (Ed.), International Conference on Computerized Production Control in Steel Plant, Korean Institute of Metals and Materials, Korea, 1993, pp. 207-211. [7] I. Ferretti, S. Zanoni, L. Zavarella, Production-inventory scheduling using ant system metaheuristic, Int. J. Prod. Econ. 104 (2) (2006) 317-323. [8] Joseph D. Blackburn, Robert A. Millen, Heuristic lot-sizing performance in a rollingschedule environment, Decis. Sci. 11 (4) (2007) 691-701. [9] Arezoo Atighehchian, Mehdi Bijari, Hamed Tarkesh, A novel hybrid algorithm for scheduling steel-making continuous casting production, Comput. Oper. Res. 36 (2009) 2450-2461. [10] D.F. Zhu, Z. Zheng, X.Q. Gao, Intelligent optimization-based production planning and simulation analysis for steelmaking and continuous casting process, J. Iron Steel Res. Int. 17 (9) (2010) 19-29. [11] H.V. Stackelberg, Theory of the Market Economy, Oxford Univ. Press, New York, 1952. 231-238. |